Trackside Oil loading 3D model preview
View source Save
120 downloads 62 likes 0 views Free price

About this 3D model

This is a trackside loading for Oil field and refinery. Assembly Instructions 1. Put nozzles on the points of the tubes 2. Glue the top plate to the tubes 3. Put the legs in the Jig stand 4. Glue 3 7mm rods on the legs 5. Glue the tube assemby to the top of the rods 6. Put walkway on the legsthen glue it